Calculatorism

Concrete Cost Calculator

Enter concrete volume and rate per m³ to estimate material cost, including pumping and wastage, for project quotes.

Input Data

Volume
m³
Rate
HK$/m³
Waste
%
Pump
HK$/m³

Results

Material Cost
8,400HK$
Total Cost
9,600HK$

At a glance:Concrete cost = volume × (1 + wastage%) × unit rate (material) + volume × pump fee (if any). Rate varies with strength grade (e.g. C30/C35), haul distance and market; pumping is per m³ or per shift. Small batches often have a minimum load (e.g. 4.5 m³), charged separately. This calculator covers only concrete delivery and pumping — not formwork, rebar, labour or compaction.

Formula

Material cost = volume × (1 + wastage%) × rate

Total cost = material cost + volume × pump fee

$$C_m = V(1+w) r$$
$$C = C_m + V p$$

How to Use

  1. Enter the concrete volume (m³).
  2. Enter the unit rate (HK$/m³).
  3. Set the wastage % and pump fee.
  4. The tool outputs material cost and total cost.

Case Studies

Slab pour

10 m³, 800, 5%, 120.

Material 8,400, pump 1,200, total 9,600.

Chute small batch

6 m³, 750, 8%, 0.

Material about 4,860, no pump, total 4,860.

FAQ

How to estimate the rate?

Ask the ready-mix plant, depending on strength grade and haul distance; peak season and remote sites are higher, so take a quote midpoint.

Minimum load?

Most plants start at 4.5 m³; below that is charged at the minimum, which small projects must include.

Related Tools

References

Content review: Calculatorism Editorial Team. Results are for reference only; please refer to the relevant authorities for the official figures.

Found a problem with the results?

If this calculator's result is wrong, or you have any question about the calculation logic, please let us know. You are viewing:Concrete Cost Calculator(/construction/concrete-cost)。